- Gas absorption heat pumps achieve up to 150% efficiency, utilizing 33.3% of energy from renewable sources. These pumps reduce gas consumption by 30-40% compared to conventional gas boilers.
This project involves a complete overhaul of the heating system and domestic hot water preparation in the industrial production building within the INA Oil Refinery in Sisak. The goal was to modernize the existing system by replacing old gas boilers with new, more energy-efficient installations. The project implemented a gas absorption heat pump and condensing heaters, significantly improving energy efficiency, reducing costs and CO2 emissions, and ensuring reliable heating and thermal comfort. This project not only enhanced energy performance but also served as an example of sustainable business practices, reducing the environmental footprint and promoting the use of green energy.
Key Points
Investor
INA INDUSTRIJA NAFTE d.d.
Location
Sisak
Capacity
356 kW
About the project
High Energy Efficiency
Domestic Hot Water Preparation
Upgraded Heat Distribution System
Safety and Durability
Environmental and Safety Measures
An Integrated PV Power Plant with a capacity of 33 kW has been installed on the roof of OFFSET PRINTING. This innovative installation, featuring 73 photovoltaic modules, harnesses the power of the ...